Horizontal restoration is the process of restoring
horizontal concrete structures. This type of restoration encompasses the
protection, rehabilitation, and/or replacement of damaged and deteriorated
structural elements. These structures, such as parking decks, plaza systems and
underground expanses, have a significant effect on your facilities appearance
and functionality. Proper restoration and maintenance, although often
overlooked, is essential in order for you to protect and preserve your capital
investments.
StructureTec Group has a long history in the evaluation,
design and restoration of horizontal structures. One notable project, that
utilized the unique capability of StructureTec Group’s design build program for
their horizontal restoration project, was Rush Oak Park Hospital in Oak Park,
Illinois.
Nearly completed weatherproofing installation. |
Rush Oak Park Hospital had a long-term water problem in an
underground unit of the hospital. The unit had been leaking for nearly 20
years, and the extensive damage had rendered the area unusable costing the
hospital valuable space. The hospital had a tenant eager to rent the unit and
needed a quick turn-around. With winter rapidly approaching, the client
selected StructureTec Group’s design build program, Premier Engineered Systems,
to fast track the project.
The cause of the leak was found to be improper below grade
waterproofing. Deficiencies such as open seams, splits and cuts allowed water
to travel under the membrane to any crack or opening in the structural slab. In
addition, the existing drainage board that was designed to funnel water away
from the unit was clogged with clay preventing it from functioning properly.
Weatherproofing installation. |
Once the lot was excavated and the below grade substrate was
exposed, a new fully-adhered, liquid-applied
waterproofing membrane system was installed with new a drainage system to
effectively route water away from the structure. The team worked double shifts in order to meet the deadline.
The project was completed with a new redesigned driving surface and parking
area with more space and an attractively updated look. Rush Oak Park Hospital now
enjoys a best-in-class weatherproofed unit that will be leak-free for decades
to come.
Finished project. |
How are your horizontal structures holding up? Contact us to
learn more about our unique design build capabilities and how we can help
increase the lifespan of your capital investments.
The young boys ended up stimulated to read through them and now have unquestionably been having fun with these things.
ReplyDeleteiosh course in chennai
Thank you so much for sharing this worth able content with us. The concept taken here will be useful for my future programs and I will surely implement them in my study. Keep blogging article like this.
ReplyDeletenebosh igc courses in chennai
Hola! I've been following your site for a long time now and finally got the bravery to go ahead and give you a shout out from Dallas Texas! Just wanted to say keep up the great job!deck handrail height
ReplyDeletegood blog
ReplyDeletesafety course in chennai
nebosh course in chennai
safety training in chennai