The hospital contacted an architect who recommended they add the green roof on top of the existing roof system. StructureTec Group had worked with the facility manager on other projects, valuing StructureTec Group's reputation for best-in-class building envelope weatherproofing, the facility manager decided to get a second opinion.
The problem with the suggested approach was that the existing roof was not designed to support a green roof. The existing roof was a 19 year-old modified bitumen roof constructed with seams in the membrane. A green roof membrane has to be designed to hold water for the plants. Thankfully the roofing experts at StructureTec caught the error before any plans were drawn. The facility manager selected StructureTec Group to design and build the green roof using the Premier Engineered Systems project delivery method.
Premier Engineered Systems is our unique Design-Build approach. This method utilizes the design expertise of StructureTec in partnership with the construction expertise of Construction Services Group, a StructureTec Group subsidiary. This design-build approach eliminates the bidding process, allowing projects to be fast-tracked and designers and contractors to work together as a unified team. This method was necessary for the project because construction was already underway on the new patient tower. Construction Services Group (CSG), had only a brief window of time to complete the project before access to the roof was blocked by the new patient tower that would be multiple stories higher than the green roof.
CSG technicians began work on the project, only to discover that the two roof areas intended for the green roof had been built differently. On one section, the existing modified bitumen roof was adhered directly to the concrete deck, not on top of insulation as it was on the other side. This discovery required the StructureTec designers to re-engineer the roof system for that section. Otherwise the roof would have been higher than the door thresholds. A plan was developed to remove the existing roof and prepare a new concrete surface coated with an aesthetically pleasing, skid resistant PMMA surface. This completely waterproofed the roof without adding any additional height.
Installed planters. |
CSG met their deadline and installed a weatherproof and beautifully landscaped green roof. The green roof is now a real focal point of the hospital. It is a unique place where they can host events but more importantly a place that promotes patient healing reflecting the hospital’s dedication to providing the highest quality of care possible to their patients.
Completed green roof. |
Thanks for sharing !
ReplyDeleteWhen it comes to Health, Safety and Environment solutions, Poshe Solutions Pvt. Ltd is the leading institute for all international safety courses.
Nebosh course in-chennai
Nebosh courses in chennai
Nebosh in Chennai
Nebosh IGC in Chennai
Iosh Ms in Chennai
Iosh courses in Chennai